Project Completion Certificate (Ground Water)
Scheme ID: 20059018 Name of Scheme: MAKRANDA PUR WSS No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 1950 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 18-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.00 / 79.79 MAKRANDAPUR 28.100571 79.710001
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump - 1 23.40 M3 / 45 M MAKRANDAPUR 28.100571 79.710001
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 100 KL - 14 M MAKRANDAPUR 28.100251 79.710231
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K 7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 4.761
2 HDPE / 6KG 75 1.264
3 HDPE / 6KG 90 0.079
4 HDPE / 6KG 110 0.939
5 HDPE / 6KG 140 0.073
HSC Connection
Sno. Total Nos.
1 402
Other Details
1.58
0.00
1.58
17-Jun-2024
06-Dec-2024