Project Completion Certificate (Ground Water)
Scheme ID: 20059100 Name of Scheme: PENG JJM No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 4600 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 10-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M/105.5M PENG 27.50937 80.25958
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 57.6M³ per Hr / 43M PENG 27.50937 80.25958
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275KL/14M PENG 27.50937 80.25958
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.044
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 4.024
2 HDPE PIPE PN:-6 75 3.433
3 HDPE PIPE PN:-6 90 2.358
4 HDPE PIPE PN:-6 110 1.063
5 HDPE PIPE PN:-6 125 0.060
6 HDPE PIPE PN:-6 140 .208
7 HDPE PIPE PN:-6 160 .497
8 HDPE PIPE PN:-6 180 .949
9 HDPE PIPE PN:-6 200 0.00
HSC Connection
Sno. Total Nos.
1 830
Other Details
3.08
0.00
3.02
09-Sep-2025
20-Feb-2026