Project Completion Certificate (Ground Water)
Scheme ID: 20059324 Name of Scheme: Daulatabad WSS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 1758 Base Year: 2022 Intermediate Year: 2037 Design Year: 2022
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 24-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.09 Daulatabad 28.524583 77.979218
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 420LPM/43Mtr Daulatabad 28.524583 77.979218
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Direct Pumping Scheme 100/12 Daulatabad 28.524583 77.979218
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.0154
2 DI-K7 150 0.0171
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.0861
2 HDPE 75 0.5131
3 HDPE 90 0.4181
4 HDPE 110 1.5379
5 HDPE 140 0.3901
HSC Connection
Sno. Total Nos.
1 302
Other Details
1.57
1.65
1.65
12-Nov-2024
23-Nov-2024