| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20059600 | Name of Scheme: MAHMDAPUR (GOGP) JJM | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2810 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 02-Feb-2024 | Actual Date of Completion (Capex): 23-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18M/ 120.8M | MAHMDAPUR (GOGP) | 27.16886 | 80.676991 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.59 M³ per Min /41Mtr | MAHMDAPUR (GOGP) | 27.16886 | 80.676991 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175KL/ 12Mtr | MAHMDAPUR (GOGP) | 27.168873 | 80.676938 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 150 | 0.01528 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 5.731 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 1.770 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 0.367 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 2.712 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 140 | 0.223 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 160 | 0.416 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |