Project Completion Certificate (Ground Water)
Scheme ID: 20060199 Name of Scheme: Birondi Fauladpur WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2000 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2024 Actual Date of Completion (Capex): 15-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.06 M / 80.54 M Birondi Fauladpur 28.350097 77.806057
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 400 LPM / 45 M Birondi Fauladpur 28.350097 77.806057
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL / 12 M Birondi Fauladpur 28.350235 77.805864
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.0262
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.617
2 HDPE 75 0.205
3 HDPE 90 0.258
4 HDPE 110 0.065
5 HDPE 140 0.406
HSC Connection
Sno. Total Nos.
1 418
Other Details
1.45
1.45
1.46
15-Aug-2025
16-Aug-2025