| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20060201 | Name of Scheme: Faridpur WSS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3477 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Aug-2024 | Actual Date of Completion (Capex): 26-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30.00 M / 86.04 M | Faridpur | 28.446052 | 77.662473 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 730 LPM / 44 M | Faridpur | 28.446052 | 77.662473 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225 Kl / 12 M | Faridpur | 28.446052 | 77.662473 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | 0.012 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 10.70 | |
| 2 | HDPE | 75 | 1.32 | |
| 3 | HDPE | 90 | 0.62 | |
| 4 | HDPE | 110 | 0.22 | |
| 5 | HDPE | 125 | 0.19 | |
| 6 | HDPE | 160 | 0.643 | |
| 7 | HDPE | 180 | 1.36 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 639 |