Project Completion Certificate (Ground Water)
Scheme ID: 20060201 Name of Scheme: Faridpur WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3477 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2024 Actual Date of Completion (Capex): 26-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.00 M / 86.04 M Faridpur 28.446052 77.662473
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 730 LPM / 44 M Faridpur 28.446052 77.662473
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 Kl / 12 M Faridpur 28.446052 77.662473
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.012
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 10.70
2 HDPE 75 1.32
3 HDPE 90 0.62
4 HDPE 110 0.22
5 HDPE 125 0.19
6 HDPE 160 0.643
7 HDPE 180 1.36
HSC Connection
Sno. Total Nos.
1 639
Other Details
2.64
2.63
2.66
26-Jul-2025
27-Jul-2025