| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20061858 | Name of Scheme: Hasuliya PWS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1650 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 06-Jan-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21.0 M / 89.57 M | Hasuliya | 26.509815 | 79.393948 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | (22.0 M3/Hr.) / 53 M | Hasuliya | 26.509815 | 79.393948 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100 KL / 16 M | Hasuliya | 26.510406 | 79.393447 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | 0.129 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.602 | |
| 2 | HDPE | 75 | 0.191 | |
| 3 | HDPE | 90 | 0.566 | |
| 4 | HDPE | 110 | 0.026 | |
| 5 | HDPE | 140 | 0.095 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 341 |