Scheme ID: 20063380 Name of Scheme: JAWALILALA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3250 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 25-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 30.04/140.22 JAWALILALA 29.594337 78.254337
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 660/60 JAWALILALA 29.594337 78.254337
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL/ 16 MTR JAWALILALA 29.594337 78.254337
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.0295
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.6743
2 HDPE 75 0.13
3 HDPE 90 0.14
4 HDPE 110 0.0915
5 HDPE 125 0.24
6 HDPE 160 0.117
HSC Connection
Sno. Total Nos.
1 391
Other Details
2.27
0.00
2.29
25-Sep-2025
26-Sep-2025