| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20063542 | Name of Scheme: AKHTYARPUR TAGA & RITHALI MV WSS | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 4155 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 01-Nov-2023 | Actual Date of Completion (Capex): 23-Nov-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30.07 Mtr/ 99.77 M | Akhtyarpur Taga | 28.37'54.5'' | 78.31'48'' |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 15 HP Submersible Pump | 52.2 cum / 46 M | Akhtyarpur Taga | 28.37'54.5'' | 78.31'48'' |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Conventional OHT | 275 KL/ 16 M | Akhtyarpur Taga | 28.37'54.5'' | 78.31'48'' |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 2.561 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 0.246 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 0.503 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.151 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.047 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 160 | 1.761 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 130 |