Project Completion Certificate (Ground Water)
Scheme ID: 20065037 Name of Scheme: Arshadpur No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2474 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jan-2024 Actual Date of Completion (Capex): 10-Jul-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21/258.32 ARSHADPUR 26.56568 80.007631
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 650/61 ARSHADPUR 26.56568 80.007631
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/14 ARSHADPUR 26.56568 80.007631
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.0066
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.811
2 HDPE 90 1.981
3 HDPE 110 0.696
4 HDPE 125 0.770
5 HDPE 140 0.332
HSC Connection
Sno. Total Nos.
1 499
Other Details
3.02
0.00
2.58
23-Nov-2024
24-Nov-2024