Project Completion Certificate (Ground Water)
Scheme ID: 20065217 Name of Scheme: SARESAR, SIRYARI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 5858 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 09-Jan-2024 Actual Date of Completion (Capex): 23-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL -1 20/54.90 SARESAR, SIRYARI 26.428379 81.588441
2 TUBEWELL-2 21.01/55.01 SARESAR, SIRYARI 26.429011 81.586336
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE -1 625 LPM / 54 M SARESAR, SIRYARI 26.428379 81.588441
2 SUBMERSIBLE - 2 625 LPM / 54 M SARESAR, SIRYARI 26.429011 81.586336
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 375 KL/16 M SARESAR, SIRYARI 26.428379 81.588441
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.351
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.095
2 HDPE 90 3.028
3 HDPE 110 1.399
4 HDPE 125 0.130
5 HDPE 140 0.421
6 HDPE 160 1.144
7 HDPE 180 0.798
8 HDPE 200 1.274
HSC Connection
Sno. Total Nos.
1 886
Other Details
5.77
0.00
5.74
23-Jan-2025
24-Apr-2025