| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20065217 | Name of Scheme: SARESAR, SIRYARI WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 6 |
| Total Population Covered: 5858 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 09-Jan-2024 | Actual Date of Completion (Capex): 23-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL -1 | 20/54.90 | SARESAR, SIRYARI | 26.428379 | 81.588441 |
| 2 | TUBEWELL-2 | 21.01/55.01 | SARESAR, SIRYARI | 26.429011 | 81.586336 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE -1 | 625 LPM / 54 M | SARESAR, SIRYARI | 26.428379 | 81.588441 |
| 2 | SUBMERSIBLE - 2 | 625 LPM / 54 M | SARESAR, SIRYARI | 26.429011 | 81.586336 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 375 KL/16 M | SARESAR, SIRYARI | 26.428379 | 81.588441 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.351 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 9.095 | |
| 2 | HDPE | 90 | 3.028 | |
| 3 | HDPE | 110 | 1.399 | |
| 4 | HDPE | 125 | 0.130 | |
| 5 | HDPE | 140 | 0.421 | |
| 6 | HDPE | 160 | 1.144 | |
| 7 | HDPE | 180 | 0.798 | |
| 8 | HDPE | 200 | 1.274 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 886 |