Project Completion Certificate (Ground Water)
Scheme ID: 20065239 Name of Scheme: SARAI HARPALI No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2000 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jan-2024 Actual Date of Completion (Capex): 18-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 1 24.45/189.95 SARAI HARPALI 26.4448602 79.977285
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 JASCO 500/70 SARAI HARPALI 26.4448602 79.977285
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/14 SARAI HARPALI 26.4448602 79.977285
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.002
2 HDPE 90 0.960
3 HDPE 110 1.974
4 HDPE 125 0.648
5 HDPE 140 1.437
HSC Connection
Sno. Total Nos.
1 551
Other Details
2.87
0.00
2.35
02-Apr-2024
03-Apr-2024