Project Completion Certificate (Ground Water)
Scheme ID: 20065241 Name of Scheme: SIMRAMAU & APAUNA No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 4503 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jan-2024 Actual Date of Completion (Capex): 18-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 34/253.33 SIMRAMAU & APAUNA 26.56956 79.88009
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 1100/62 SIMRAMAU & APAUNA 26.56956 79.88009
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/16 SIMRAMAU & APAUNA 26.56956 79.88009
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.0089
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.253
2 HDPE 90 3.094
3 HDPE 110 0.387
4 HDPE 125 0.168
5 HDPE 140 0.202
6 HDPE 160 3.163
7 HDPE 200 1.804
HSC Connection
Sno. Total Nos.
1 888
Other Details
5.06
0.00
4.15
02-May-2024
03-May-2024