| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20065261 | Name of Scheme: Barauli PWS | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 2820 | Base Year: 2023 | Intermediate Year: 0 | Design Year: 0 |
| Date of Completion (As per Contract): 01-Jun-2022 | Actual Date of Completion (Capex): 18-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL | 15 M / 60.52 M | BARAULI | 26.774521 | 79.646214 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 600LPM / 53M | BARAULI | 26.774521 | 79.646214 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175 KL / 16M | BARAULI | 26.774521 | 79.646214 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.011 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.4685 | |
| 2 | HDPE | 90 | 0.637 | |
| 3 | HDPE | 110 | 1.184 | |
| 4 | HDPE | 125 | 0.315 | |
| 5 | HDPE | 140 | 1.776 | |
| 6 | HDPE | 160 | 0.491 | |
| 7 | HDPE | 180 | 0.509 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 489 |