Project Completion Certificate (Ground Water)
Scheme ID: 20065266 Name of Scheme: Aniso PWS No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 2861 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jan-2024 Actual Date of Completion (Capex): 10-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15m/70.33m Anison 26.7571 79.6497
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible 600LPM/51M Anison 26.7571 79.6497
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175KL/14M Anison 26.7571 79.6497
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0098
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.224
2 HDPE 90 2.074
3 HDPE 110 1.657
4 HDPE 125 1.089
5 HDPE 140 0.741
6 HDPE 160 0.288
HSC Connection
Sno. Total Nos.
1 611
Other Details
2.62
0.00
2.79
09-Jun-2024
11-Jun-2024