| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20065274 | Name of Scheme: Ratanpur gadiya PWS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2519 | Base Year: 0 | Intermediate Year: 0 | Design Year: 0 |
| Date of Completion (As per Contract): 01-Jun-2022 | Actual Date of Completion (Capex): 05-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL | 28.83M / 143 M | RATANPUR | 26.601535 | 79.356742 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 550 LPM / 51 M | RATANPUR | 26.601535 | 79.356742 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 14 M | RATANPUR | 26.601535 | 79.356742 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0165 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.4647 | |
| 2 | HDPE | 90 | 2.2913 | |
| 3 | HDPE | 110 | 0.194 | |
| 4 | HDPE | 125 | 0.599 | |
| 5 | HDPE | 140 | 0.6673 | |
| 6 | HDPE | 160 | 0.9508 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 562 |