Project Completion Certificate (Ground Water)
Scheme ID: 20065288 Name of Scheme: Piparpur PWS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2424 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 22-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 24.05 M / 140.30 M PIPARPUR 26.580311 79.529795
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 500 LPM / 55 M PIPARPUR 26.580311 79.529795
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 18 M PIPARPUR 26.580311 79.529795
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0205
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.490
2 HDPE 90 0.475
3 HDPE 110 0.186
4 HDPE 125 0.125
5 HDPE 140 1.452
6 HDPE 160 1.607
HSC Connection
Sno. Total Nos.
1 456
Other Details
2.10
0.00
2.17
21-Aug-2024
23-Aug-2024