Scheme ID: 20065300 Name of Scheme: Nagla Pathak PWS No. of Villages: 3 No. of Habitation Covered: 6
Total Population Covered: 3104 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jan-2023 Actual Date of Completion (Capex): 04-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 32.22m/139.55m Nagla Pathak 26.574276 79.441344
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible 650LPM/51M Nagla Pathak 26.574276 79.441344
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200KL/14M Nagla Pathak 26.574276 79.441344
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0115
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.0833
2 HDPE 90 2.072
3 HDPE 110 1.888
4 HDPE 125 1.162
5 HDPE 140 0.272
HSC Connection
Sno. Total Nos.
1 663
Other Details
2.54
0.00
2.56
03-Jan-2025