Project Completion Certificate (Ground Water)
Scheme ID: 20066554 Name of Scheme: GHORDAUR VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 13
Total Population Covered: 4214 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 27-Jan-2024 Actual Date of Completion (Capex): 18-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200X150 24 m/181.25 m Ghordaur 25.560705 82.980495
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP 600 LPM/44 M Ghordaur 25.560705 82.980495
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 KL /12 M Ghordaur 25.56061 82.98044
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 150 0.011 yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.95 yes
2 HDPE 75 5.464 yes
3 HDPE 63 6.411 yes
4 HDPE 110 .324 yes
5 HDPE 125 .548 yes
6 HDPE 140 .829 yes
7 HDPE 160 .058 yes
8 HDPE 180 0.023
HSC Connection
Sno. Total Nos.
1 361
Other Details
2.16
2.16
2.17
18-Jan-2026
19-Jan-2026