| Scheme ID: 20066592 | Name of Scheme: BAHARPUR WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 13 |
| Total Population Covered: 5733 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Apr-2024 | Actual Date of Completion (Capex): 24-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL - 1 | 24.8 / 96.8 | BAHARPUR | 26.565259 | 81.647576 |
| 2 | TUBEWELL - 2 | 24.28/95.88 | BAHARPUR | 26.562173 | 81.645821 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE - 1 | 625 LPM/ 56 M | BAHARPUR | 26.565259 | 81.647576 |
| 2 | SUBMERSIBLE-2 | 625 LPM/ 56 M | BAHARPUR | 26.562173 | 81.645821 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 350 KL/18M | BAHARPUR | 26.565259 | 81.647576 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.64 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 11.569 | |
| 2 | HDPE | 90 | 4.521 | |
| 3 | HDPE | 110 | 0.288 | |
| 4 | HDPE | 125 | 0.358 | |
| 5 | HDPE | 140 | 0.784 | |
| 6 | HDPE | 160 | 2.620 | |
| 7 | HDPE | 180 | 0.566 | |
| 8 | HDPE | 200 | 0.750 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 783 |