| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066663 | Name of Scheme: BHAUSINGH PUR WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 12 |
| Total Population Covered: 4058 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Dec-2023 | Actual Date of Completion (Capex): 14-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.06/ 41.49 | BHAUSINGH PUR | 26.078354 | 81.840482 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE - 1 | 850 LPM/54 M | BHAUSINGH PUR | 26.078354 | 81.840482 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 250 KL/ 16 M | BHAUSINGH PUR | 26.078354 | 81.840482 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.022 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 14.479 | |
| 2 | HDPE | 90 | 6.414 | |
| 3 | HDPE | 110 | 2.366 | |
| 4 | HDPE | 125 | 0.622 | |
| 5 | HDPE | 140 | 0.867 | |
| 6 | HDPE | 160 | 0.707 | |
| 7 | HDPE | 180 | 0.233 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 803 |