Project Completion Certificate (Ground Water)
Scheme ID: 20066815 Name of Scheme: CHITWANA SHERPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3303 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 12-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.08 Mtr / 95.99 Mtr CHITWANA SHERPUR 28.98698 77.976796
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 300 LPM / 50 Mtr CHITWANA SHERPUR 28.98698 77.976796
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 Kl / 14 M CHITWANA SHERPUR 28.98698 77.976796
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.679
2 HDPE 90 1.777
3 HDPE 110 0.397
4 HDPE 140 0.315
HSC Connection
Sno. Total Nos.
1 656
Other Details
2.50
2.50
1.99
31-Mar-2025
01-Apr-2025