Project Completion Certificate (Ground Water)
Scheme ID: 20066878 Name of Scheme: Pulandar No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3563 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 13-Jan-2023 Actual Date of Completion (Capex): 14-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 8/60.23 PULANDAR 26.225666° 79.9974168°
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 750/68 PULANDAR 26.225666° 79.9974168°
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/14 PULANDAR 26.225666° 79.9974168°
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 6.900
2 HDPE PIPE 75 1.825
3 HDPE PIPE 90 0.295
4 HDPE PIPE 110 1.201
5 HDPE PIPE 125 0.302
6 HDPE PIPE 140 0.129
7 HDPE PIPE 160 0.120
8 HDPE PIPE 180 0.051
9 HDPE PIPE 200 0.079
HSC Connection
Sno. Total Nos.
1 681
Other Details
2.37
0.00
2.82
06-Oct-2024
07-Oct-2024