| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067009 | Name of Scheme: DURRAJPUR, RATAPUR | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 3358 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2023 |
| Date of Completion (As per Contract): 13-Jan-2023 | Actual Date of Completion (Capex): 14-Sep-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 8/66 | DURRAJPUR | 26.32462° | 79.653918° |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 700/68 | DURRAJPUR | 26.32462° | 79.653918° |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200/12 | DURRAJPUR | 26.32462° | 79.653918° |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.025 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 6.576 | |
| 2 | HDPE PIPE | 75 | 1.220 | |
| 3 | HDPE PIPE | 90 | 0.389 | |
| 4 | HDPE PIPE | 110 | 0.424 | |
| 5 | HDPE PIPE | 125 | 0.414 | |
| 6 | HDPE PIPE | 140 | 2.707 | |
| 7 | HDPE PIPE | 160 | 0.280 | |
| 8 | HDPE PIPE | 180 | 0.474 | |
| 9 | HDPE PIPE | 200 | 0.026 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 565 |