Project Completion Certificate (Ground Water)
Scheme ID: 20067049 Name of Scheme: SATAHARI & BICHHAURA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 8
Total Population Covered: 4570 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 23-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 14.02 M / 41.99 M Sathari & Bichaura 26.37747669 81.96363782
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 760 LPM / 50 M Sathari & Bichaura 26.37747669 81.96363782
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 KL /16 M Sathari & Bichaura 26.37747669 81.96363782
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 150 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6: Class PE-100 63 15.614
2 HDPE / PN-6: Class PE-100 75 2.765
3 HDPE / PN-6: Class PE-100 90 1.523
4 HDPE / PN-6: Class PE-100 110 0.714
5 HDPE / PN-6: Class PE-100 125 1.414
6 HDPE / PN-6: Class PE-100 140 3.317
7 HDPE / PN-6: Class PE-100 160 0.216
8 HDPE / PN-6: Class PE-100 200 0.112
HSC Connection
Sno. Total Nos.
1 522
Other Details
3.34
0.00
3.40
27-May-2025
01-Jul-2025