| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067173 | Name of Scheme: INDAURPUR GHINHAPUR Water Supply Scheme | No. of Villages: 3 | No. of Habitation Covered: 9 |
| Total Population Covered: 5100 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 23-Mar-2024 | Actual Date of Completion (Capex): 21-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of borewell Assembly | 42.0M/63.99M | INDAURPUR GHINHAPUR | 26.350288 | 83.063804 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 20 HP Submersible Pump | 1100LPM/45M | INDAURPUR GHINHAPUR | 26.350288 | 83.063804 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 300KL/14M | INDAURPUR GHINHAPUR | 26.350288 | 83.063804 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 150 | 0.040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 90 | 1.475 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 3.693 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 63 | 17.103 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0325 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.886 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 180 | 0.506 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 200 | 3.312 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 695 |