Project Completion Certificate (Ground Water)
Scheme ID: 20067178 Name of Scheme: AGWASI No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 3859 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 13-Jan-2023 Actual Date of Completion (Capex): 14-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 8/66.00 AGAWASI 26.397755°N 79.749678°E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERCIBLE 810/68 AGAWASI 26.397755°N 79.749678°E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/12 AGAWASI 26.397755°N 79.749678°E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 9.611
2 HDPE PIPE 75 0.684
3 HDPE PIPE 90 0.168
4 HDPE PIPE 110 1.803
5 HDPE PIPE 125 0.629
6 HDPE PIPE 140 0.274
7 HDPE PIPE 160 0.022
8 HDPE PIPE 180 0.688
9 HDPE PIPE 200 2.243
HSC Connection
Sno. Total Nos.
1 754
Other Details
3.10
0.00
3.70
25-Nov-2023
26-Nov-2023