Project Completion Certificate (Ground Water)
Scheme ID: 20067208 Name of Scheme: DEVLAR, Water Supply Scheme No. of Villages: 3 No. of Habitation Covered: 10
Total Population Covered: 4170 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Mar-2024 Actual Date of Completion (Capex): 14-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 33M/96.5M Devlar 26.365871 83.063804
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP Submersible Pump 900LPM/45M Devlar 26.365871 83.063804
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.602
2 HDPE Pipe PN-6: Class PE-100 75 2.103
3 HDPE Pipe PN-6: Class PE-100 63 18.458
4 HDPE Pipe PN-6: Class PE-100 110 1.365
5 HDPE Pipe PN-6: Class PE-100 125 0.503
6 HDPE Pipe PN-6: Class PE-100 140 0.605
7 HDPE Pipe PN-6: Class PE-100 160 0.0042
8 HDPE Pipe PN-6: Class PE-100 180 0.484
9 HDPE Pipe PN-6: Class PE-100 200 0.088
HSC Connection
Sno. Total Nos.
1 539
Other Details
3.18
3.24
3.24
17-Nov-2025
18-Nov-2025