Project Completion Certificate (Ground Water)
Scheme ID: 20067226 Name of Scheme: NIKASPUR Water Supply Scheme No. of Villages: 8 No. of Habitation Covered: 13
Total Population Covered: 5250 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Mar-2024 Actual Date of Completion (Capex): 24-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 33.14M/67.47M Dubouly 26.319993 83.050411
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 20HP Submersible Pump 1100LPM/45M Dubouly 26.319993 83.050411
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 325KL/14M Dubouly 26.319993 83.050411
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 2.093
2 HDPE Pipe PN-6: Class PE-100 75 3.157
3 HDPE Pipe PN-6: Class PE-100 63 26.523
4 HDPE Pipe PN-6: Class PE-100 110 1.899
5 HDPE Pipe PN-6: Class PE-100 125 1.466
6 HDPE Pipe PN-6: Class PE-100 140 0.147
7 HDPE Pipe PN-6: Class PE-100 160 2.768
8 HDPE Pipe PN-6: Class PE-100 180 0.302
HSC Connection
Sno. Total Nos.
1 611
Other Details
4.48
4.48
4.48
12-Sep-2025
13-Sep-2025