Project Completion Certificate (Ground Water)
Scheme ID: 20067235 Name of Scheme: AGAI & BAHUBARA & KHADAR BASANTPUR & PRATAPPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 5 No. of Habitation Covered: 40
Total Population Covered: 18160 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 10-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell-1,2&3 64.06 M / 649.39 M Agai,bahubara,khadar basantpur & pratappur 26.420049 82.043949
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1,2&3 685 & 1040 LPM/ 50 M Agai,bahubara,khadar basantpur & pratappur 26.420049 82.043949
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1&2 300 & 400 KL / 14 & 18 M Agai,bahubara,khadar basantpur & pratappur 26.420049 82.043949
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 125 0.378
2 DI / K7 150 0.020
3 DI / K7 200 1.084
4 DI / K7 250 0.828
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6: Class PE-100 63 52.481
2 HDPE / PN-6: Class PE-100 75 4.955
3 HDPE / PN-6: Class PE-100 90 4.061
4 HDPE / PN-6: Class PE-100 110 1.522
5 HDPE / PN-6: Class PE-100 125 1.953
6 HDPE / PN-6: Class PE-100 140 1.082
7 HDPE / PN-6: Class PE-100 160 1.01
8 HDPE / PN-6: Class PE-100 180 3.237
9 HDPE / PN-6: Class PE-100 200 1.413
HSC Connection
Sno. Total Nos.
1 2163
Other Details
10.44
0.00
10.64
14-May-2025
01-Jul-2025