Project Completion Certificate (Ground Water)
Scheme ID: 20067277 Name of Scheme: BAIRI BUJURG Water Supply Scheme No. of Villages: 5 No. of Habitation Covered: 15
Total Population Covered: 2880 Base Year: 2023 Intermediate Year: 2035 Design Year: 2053
Date of Completion (As per Contract): 22-Feb-2023 Actual Date of Completion (Capex): 18-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 24.09 M/ 63.58 M Bairi Bujurg 26.388424 82.974656
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP Submersible Pump 600LPM/46M Bairi Bujurg 26.388424 82.974656
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 175KL/14MTR Bairi Bujurg 26.388424 82.974656
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.0265
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.111
2 HDPE Pipe PN-6: Class PE-100 75 1.098
3 HDPE Pipe PN-6: Class PE-100 63 15.401
4 HDPE Pipe PN-6: Class PE-100 110 0.382
5 HDPE Pipe PN-6: Class PE-100 125 1.613
6 HDPE Pipe PN-6: Class PE-100 140 0.238
7 HDPE Pipe PN-6: Class PE-100 160 0.490
8 HDPE Pipe PN-6: Class PE-100 180 0.417
HSC Connection
Sno. Total Nos.
1 354
Other Details
2.66
2.66
2.66
28-Feb-2026
01-Mar-2026