Project Completion Certificate (Ground Water)
Scheme ID: 20067296 Name of Scheme: AHER GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 13
Total Population Covered: 8890 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Sep-2024 Actual Date of Completion (Capex): 07-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 40.02/185.07 AHER 26.9498688 79.7552336
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE PUMP 900/60 AHER 26.9498688 79.7552336
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 500/18 AHER 26.9498688 79.7552336
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0097 Clear Water Rising Main
2 DI 150 0.466 Clear Water Rising Main
3 DI 200 0.00935 Clear Water Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 5.66 Distribution Network
2 HDPE 63 12.459 Distribution Network
3 HDPE 110 3.598 Distribution Network
4 HDPE 140 3.553 Distribution Network
5 HDPE 160 1.434 Distribution Network
6 HDPE 180 0.544 Distribution Network
7 HDPE 200 2.250 Distribution Network
HSC Connection
Sno. Total Nos.
1 1605
Other Details
8.06
7.95
8.06
10-Aug-2024
11-Aug-2024