Project Completion Certificate (Ground Water)
Scheme ID: 20067299 Name of Scheme: PEERPUR Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 12
Total Population Covered: 4140 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Feb-2024 Actual Date of Completion (Capex): 19-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of tubewell assembly 24/125.80 PEERPUR 26.366743 82.554611
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 ACsubmersible pumping 17.5HP 900/46 PEERPUR 26.366735 82.554620
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 250/16 PEERPUR 26.366730 82.554625
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 150 0.032
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.078
2 HDPE Pipe PN-6: Class PE-100 75 0.839
3 HDPE Pipe PN-6: Class PE-100 63 15.876
4 HDPE Pipe PN-6: Class PE-100 110 0.695
5 HDPE Pipe PN-6: Class PE-100 140 1.577
6 HDPE Pipe PN-6: Class PE-100 160 0.284
7 HDPE Pipe PN-6: Class PE-100 200 0.032
HSC Connection
Sno. Total Nos.
1 590
Other Details
3.14
3.05
3.05
19-Jul-2025
07-Aug-2025