| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067333 | Name of Scheme: DALUPUR SULTANPUR & HARKARANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 3246 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Aug-2024 | Actual Date of Completion (Capex): 30-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 11.00/80.50 | DALUPUR SULTANPUR & HARKARANPUR | 27.198005 | 79.412353 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSSIBLE PUMP | 700/61 | DALUPUR SULTANPUR & HARKARANPUR | 27.198005 | 79.412353 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200/14 | DALUPUR SULTANPUR & HARKARANPUR | 27.198005 | 79.412353 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0185 | Clear Water Rising Main |
| 2 | DI | 150 | 0.0057 | Clear Water Rising Main |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 2.512 | Distribution Network |
| 2 | HDPE | 63 | 3.672 | Distribution Network |
| 3 | HDPE | 110 | 0.928 | Distribution Network |
| 4 | HDPE | 140 | 1.276 | Distribution Network |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 673 |