Project Completion Certificate (Ground Water)
Scheme ID: 20067403 Name of Scheme: SARGOLI & RAUNSA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 6
Total Population Covered: 3948 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 16-Aug-2024 Actual Date of Completion (Capex): 30-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.00/116.30 SARGOLI & RAUNSA 26.891442 79.549982
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE PUMP 850/58 SARGOLI & RAUNSA 26.891442 79.549982
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/16 SARGOLI & RAUNSA 26.891442 79.549982
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0127 Clear Water Rising Main
2 DI 150 0.0041 Clear Water Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.675 Distribution Network
2 HDPE 63 5.891 Distribution Network
3 HDPE 110 1.666 Distribution Network
4 HDPE 140 1.991 Distribution Network
5 HDPE 160 1.544 Distribution Network
HSC Connection
Sno. Total Nos.
1 650
Other Details
3.49
3.45
3.49
03-Aug-2024
04-Aug-2024