Project Completion Certificate (Ground Water)
Scheme ID: 20067432 Name of Scheme: BARAGAON Water Supply Scheme No. of Villages: 5 No. of Habitation Covered: 10
Total Population Covered: 6250 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Feb-2024 Actual Date of Completion (Capex): 12-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 36.52 M/ 71.88 M Baragaon 26.463564 83.007165
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 25 HP Submersible Pump 1350LPM/46M Baragaon 26.463564 83.007165
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 375KL/16MTR Baragaon 26.463564 83.007165
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 200 0.039
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 3.006
2 HDPE Pipe PN-6: Class PE-100 75 3.484
3 HDPE Pipe PN-6: Class PE-100 63 29.548
4 HDPE Pipe PN-6: Class PE-100 125 1.445
5 HDPE Pipe PN-6: Class PE-100 140 0.996
6 HDPE Pipe PN-6: Class PE-100 160 0.220
7 HDPE Pipe PN-6: Class PE-100 180 0.524
8 HDPE Pipe PN-6: Class PE-100 200 0.892
HSC Connection
Sno. Total Nos.
1 850
Other Details
4.75
4.75
4.75
28-Feb-2026
01-Mar-2026