Project Completion Certificate (Ground Water)
Scheme ID: 20067466 Name of Scheme: SUTHENA GOGP JJM No. of Villages: 2 No. of Habitation Covered: 11
Total Population Covered: 6060 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2024 Actual Date of Completion (Capex): 30-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 28M/ 114.8M SUTHENA 27.159262 80.365606
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.230 M³ per Min /45Mtr SUTHENA 27.159262 80.365606
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 376KL/ 16Mtr SUTHENA 27.159286 80.365505
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.01854
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 5.507
2 HDPE Pipe PN-6, Class PE-100 75 5.912
3 HDPE Pipe PN-6, Class PE-100 90 4.166
4 HDPE Pipe PN-6, Class PE-100 110 2.211
5 HDPE Pipe PN-6, Class PE-100 125 1.938
6 HDPE Pipe PN-6, Class PE-100 160 1.940
7 HDPE Pipe PN-6, Class PE-100 200 2.470
HSC Connection
Sno. Total Nos.
1 981
Other Details
4.72
0.00
4.62
29-Jun-2025
26-Sep-2025