Project Completion Certificate (Ground Water)
Scheme ID: 20067544 Name of Scheme: Sultanpur Sadat water supply scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1838 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 06-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30 / 156.40 SULTANPUR SADAT 29.543906 78.227452
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 400 / 55 SULTANPUR SADAT 29.543906 78.227452
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL / 12 MTR SULTANPUR SADAT 29.543906 78.227452
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 2.8954
2 HDPE PIPE 75 0.087
3 HDPE PIPE 90 1.466
4 HDPE PIPE 110 0.031
5 HDPE PIPE 125 0.0087
6 HDPE PIPE 140 0.268
HSC Connection
Sno. Total Nos.
1 380
Other Details
1.67
0.00
1.70
06-Jul-2025
07-Jul-2025