Project Completion Certificate (Ground Water)
Scheme ID: 20068288 Name of Scheme: SURATGARH &AJABGARH WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 10
Total Population Covered: 3715 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 02-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 19.07/70.27 SURATGARH & AJABGARH 26.335710 81.594820
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE - 1 800 LPM/ 54 M SURATGARH & AJABGARH 26.335710 81.594820
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 225 KL/ 16 M SURATGARH & AJABGARH 26.335710 81.594820
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 14.920
2 HDPE 90 0.931
3 HDPE 110 0.777
4 HDPE 140 0.551
5 HDPE 160 1.728
6 HDPE 180 1.074
HSC Connection
Sno. Total Nos.
1 790
Other Details
4.11
0.00
4.10
02-Jun-2025
03-Sep-2025