Project Completion Certificate (Ground Water)
Scheme ID: 20068424 Name of Scheme: JAMEEN SURJUPUR WSS No. of Villages: 3 No. of Habitation Covered: 9
Total Population Covered: 2890 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Mar-2024 Actual Date of Completion (Capex): 09-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18.03/86.8 Jamin Surjupur 26º 17' 23.35" N 82º 47' 51.516" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 30/47 Jamin Surjupur 26º 17' 23.35" N 82º 47' 51.516" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 150/16 Jamin Surjupur 26º 17' 23.35" N 82º 47' 51.516" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 16.946
2 HDPE Pipe PN-6: Class PE-100 75 3.04
3 HDPE Pipe PN-6: Class PE-100 90 1.216
4 HDPE Pipe PN-6: Class PE-100 110 1.097
5 HDPE Pipe PN-6: Class PE-100 140 0.477
HSC Connection
Sno. Total Nos.
1 400
Other Details
2.08
0.00
0.00
31-Jan-2026
01-Mar-2026