Scheme ID: 20069409 Name of Scheme: KOTHARAKALA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 2660 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 05-Feb-2024 Actual Date of Completion (Capex): 25-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 14/69.2 KOTHARAKALA 26.086046 82.285103
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 560LPM/43M KOTHARAKALA 26.086046 82.285103
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/12M KOTHARAKALA 26.086046 82.285103
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.022
2 DI Pipe K-7 150 0.005
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 10.458
2 HDPE-PN-6 , PE-100 75 2.809
3 HDPE-PN-6 , PE-100 90 1.072
4 HDPE-PN-6 , PE-100 110 0.961
5 HDPE-PN-6 , PE-100 140 0.406
6 HDPE-PN-6 , PE-100 160 0.024
HSC Connection
Sno. Total Nos.
1 422
Other Details
2.45
2.45
2.44
26-May-2026