Project Completion Certificate (Ground Water)
Scheme ID: 20070200 Name of Scheme: BHIKKI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2904 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 07-Aug-2024 Actual Date of Completion (Capex): 08-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TubeWell 18.05/102.76 Bhikki 29.419995 77.787622
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 250LPM/47Mtr Bhikki 29.419995 77.787622
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank 100KL/14M Bhikki 29.419995 77.787622
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0074 Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3574.30
2 HDPE 75 258.60
3 HDPE 90 542.90
4 HDPE 110 184.30
5 HDPE 160 422
6 HDPE 200 200.60
HSC Connection
Sno. Total Nos.
1 590
Other Details
1.50
0.00
1.50
08-Jul-2025
09-Jul-2025