Project Completion Certificate (Ground Water)
Scheme ID: 20070461 Name of Scheme: Nagla Khakam W/S Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1710 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Sep-2024 Actual Date of Completion (Capex): 30-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.03 Mtr/ 110.26 M Nagla Khakam 28.462518 78.645589
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 7.5 HP Submersible Pump 22.8 cum / 46 M Nagla Khakam 28.462518 78.645589
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 100 KL/ 14 M Nagla Khakam 28.46272 78.645808
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.0455
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.270
2 HDPE Pipe PN-6: Class PE-100 75 0.192
3 HDPE Pipe PN-6: Class PE-100 63 2.459
4 HDPE Pipe PN-6: Class PE-100 110 0.091
5 HDPE Pipe PN-6: Class PE-100 140 0.429
HSC Connection
Sno. Total Nos.
1 230
Other Details
1.44
1.38
1.38
01-Oct-2025
01-Jan-2026