Project Completion Certificate (Ground Water)
Scheme ID: 20071180 Name of Scheme: REORGANISATION KASIYA KUNDA VILLAGE W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3890 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-Mar-2024 Actual Date of Completion (Capex): 25-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WEELL N/A KASIYA KUNDA 29.00022 78.930214
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 10 HP 1000 LPM/47 M KASIYA KUNDA 29.00022 78.930214
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL/12 M KASIYA KUNDA 29.00022 78.930214
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 200 0.3
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 63 5.55
2 HDPE PIPE PN-6: CLASS PE-100 75 0.73
3 HDPE PIPE PN-6: CLASS PE-100 90 0.57
4 HDPE PIPE PN-6: CLASS PE-100 110 0.28
5 HDPE PIPE PN-6: CLASS PE-100 140 0.50
HSC Connection
Sno. Total Nos.
1 455
Other Details
1.52
1.52
1.51
15-Apr-2024
16-Apr-2024