Project Completion Certificate (Ground Water)
Scheme ID: 20072053 Name of Scheme: RAMGARH WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3610 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 05-Feb-2026 Actual Date of Completion (Capex): 03-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 19/42.5 RAMGARH 26.124573 82.279675
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 760LPM/48M RAMGARH 26.124573 82.279675
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225KL/18M RAMGARH 26.124573 82.279675
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.0299
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 1.272
2 HDPE-PN-6 , PE-100 75 2.874
3 HDPE-PN-6 , PE-100 90 18.253
4 HDPE-PN-6 , PE-100 110 0.691
5 HDPE-PN-6 , PE-100 140 0.512
6 HDPE-PN-6 , PE-100 160 0.017
HSC Connection
Sno. Total Nos.
1 402
Other Details
3.01
3.01
3.01
04-Jun-2026
05-Jun-2026