Project Completion Certificate (Ground Water)
Scheme ID: 20072682 Name of Scheme: CHAMARAWAL WATWR SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5048 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Mar-2025 Actual Date of Completion (Capex): 31-Dec-2027
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 34/88.15 CHAMRAWAL 28.874642 77.384352
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 975LPM/64M CHAMRAWAL 28.874642 77.384352
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300KL/12M CHAMRAWAL 28.874738 77.384170
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K7 200 0.0076
2 K7 150 0.0303
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.7429
2 HDPE 75 0.696
3 HDPE 63 7.8698
4 HDPE 180 0.0501
5 HDPE 160 0.0534
6 HDPE 140 0.065
7 HDPE 125 0.3531
8 HDPE 110 0.2942
HSC Connection
Sno. Total Nos.
1 852
Other Details
2.31
2.31
2.47
31-Jan-2026
01-Feb-2026