| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20075106 | Name of Scheme: BHIURA WSS | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 2200 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Mar-2024 | Actual Date of Completion (Capex): 04-Aug-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 12/80.80 | BHIURA | 26º 30' 15.08" N | 82º 25' 01.2" E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VTPump-1 | 17.40/43 | BHIURA | 26º 30' 15.08" N | 82º 25' 01.2" E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 75/12 | BHIURA | 26º 30' 15.08" N | 82º 25' 01.2" E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-7 | 80 | 0.04 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 7.100 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 0.486 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 0.205 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 225 |