Project Completion Certificate (Ground Water)
Scheme ID: 20075128 Name of Scheme: BARAMADPUR JARIYARI WSS No. of Villages: 1 No. of Habitation Covered: 12
Total Population Covered: 6670 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Feb-2024 Actual Date of Completion (Capex): 22-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 33/71.80 BARMADPUR JARIYARE 26º 24' 02.06" N 82º 24' 29.97" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 57/44 BARMADPUR JARIYARE 26º 24' 02.06" N 82º 24' 29.97" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Zink Alum Tank 250/14 BARMADPUR JARIYARE 26º 24' 02.06" N 82º 24' 29.97" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 26.403
2 HDPE Pipe PN-6: Class PE-100 75 4.057
3 HDPE Pipe PN-6: Class PE-100 90 1.321
4 HDPE Pipe PN-6: Class PE-100 110 1.830
5 HDPE Pipe PN-6: Class PE-100 125 1.014
6 HDPE Pipe PN-6: Class PE-100 140 0.649
7 HDPE Pipe PN-6: Class PE-100 160 0.019
HSC Connection
Sno. Total Nos.
1 750
Other Details
3.43
0.00
3.38
15-Oct-2025
16-Oct-2025