Scheme ID: 20075144 Name of Scheme: BALA PAIKAULI WSS No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 3520 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Mar-2024 Actual Date of Completion (Capex): 20-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.04/ 68.88 Bala Paikauli 26º 32' 44.346" N 82º 22' 4.451" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 28.80/47 Bala Paikauli 26º 32' 44.346" N 82º 22' 4.451" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Zink Alum Tank 125/16 Bala Paikauli 26º 32' 44.346" N 82º 22' 4.451" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 9.877
2 HDPE Pipe PN-6: Class PE-100 75 2.261
3 HDPE Pipe PN-6: Class PE-100 90 0.919
4 HDPE Pipe PN-6: Class PE-100 110 1.158
5 HDPE Pipe PN-6: Class PE-100 140 0.102
6 HDPE Pipe PN-6: Class PE-100 160 0.028
HSC Connection
Sno. Total Nos.
1 400
Other Details
2.01
0.00
0.00
14-Oct-2025
15-Oct-2025