Project Completion Certificate (Ground Water)
Scheme ID: 20075258 Name of Scheme: CHUCHAI & SALAH RASULPUR PANH No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 4668 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 19-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 42.18 Mtr / 102.07 Mtr Chuchai-Salah Rasulpur Panah 28.901823 78.015552
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 950 LPM / 50 Mtr Chuchai-Salah Rasulpur Panah 28.901823 78.015552
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275 Kl / 14 M Chuchai-Salah Rasulpur Panah 28.901823 78.015552
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0209
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.607
2 HDPE 90 2.882
3 HDPE 110 0.729
4 HDPE 125 0.210
5 HDPE 140 0.338
6 HDPE 180 1.130
HSC Connection
Sno. Total Nos.
1 819
Other Details
4.11
4.11
3.33
14-Oct-2024
15-Oct-2024